The problem of the transformer skeleton should be noted:
The pipeline is not neatly arranged
Transformer primary and secondary casing damage
The first and second leads of the transformer, the bolts are not tight, and the pressing is not strong. The gap between the busbar and the transformer does not meet the specifications.
Prevention
Improve quality awareness and build according to process standards
Porcelain casing strengthens protection during handling
Sales Manager: Winni
Mobile: 0086-18902856858
Skype: winnivictor
E-mail:winni@proper-mold.com
Sweep and watch us